Cardiac
recovery unit
Client
Kings NHS
Trust
Value
£900,000.00.
Completed Jan
04.
Job spec
Steel frame building, built into the lightwell area of a fully operational hospital with no vehicular access direct
to site, all components of the building were lifted into position by crane.
Clad with Kingspan cladding and fitted out with high specification medical services to suit a state of the art scanner
service.
Standard partitions and feature linoleum flooring throughout with high spec ceilings and comfort lighting